What is RA capacity?

What is RA capacity?

RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes. RA Capacity encompasses both the RAR Attributes and LAR Attributes of the capacity provided by a Unit.

What is System RA?

Resource Adequacy, commonly referenced as “RA” for short, is a term that is often heard but frequently not well understood in the electricity sector. This “System” RA obligation ensures that those resources will be available to serve CAISO demand when needed.

How does california resource adequacy work?

California’s Resource Adequacy Program In California, the California Public Utilities Commission manages a resource adequacy program. This program obliges electricity providers (usually electric utilities) to pay power plant owners for electricity-generating capacity.

What is RA CAISO?

The California Independent System Operator (CAISO) is performing a comprehensive review of the CAISO’s Resource Adequacy (RA) provisions and proposing enhancements that ensure effective procurement of capacity to reliably operate the grid all hours of the year.

What is net qualifying capacity?

Each year, CPUC staff work with the California Independent System Operator (CAISO) to publish a net qualifying capacity (NQC) list which describes the amount of capacity from each resource that can be counted towards meeting Resource Adequacy (RA) requirements in the CPUC’s RA program.

What is resource adequacy capacity?

Resource adequacy is the ability to meet consumers’ energy needs. In other words, we need capacity – available energy that can be called upon as needed to meet the extremes. The transmission system is also critical to making sure the power can be delivered.

Does California have a capacity market?

The CAISO does not operate a formal capacity market, but it does have a mandatory resource adequacy requirement, which is based on the California Public Utility Commission’s Resource Adequacy framework.

What is a Caiso tariff?

CAISO Tariff means the California Independent System Operator Corporation Operating Agreement and Tariff, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time to time and approved by the FERC. Sample 2. Sample 3. Based on 83 documents. 83.

How does Nyiso capacity market work?

The capacity market requires Load-Serving Entities (LSEs), such as utilities, to purchase sufficient capacity to meet their peak demand reliably. In a capacity auction, suppliers submit offers to reflect the cost of their available capacity, and LSEs submit bids to purchase it.

Does ercot have capacity market?

Unlike other U.S. electric grid operators, ERCOT does not have a capacity market – payments made to operators to ensure power needs in coming years – to handle events like the freeze. Since 2010, ERCOT’s reserve margin – the buffer between what it can produce vs.

Is Caiso regulated by FERC?

The CAISO is regulated by the Federal Energy Regulatory Commission (or FERC), an independent federal agency that regulates the interstate transmission of electricity, natural gas, and oil. The California Public Utilities Commission regulates investor-owned utilities operating in the CAISO balancing authority area.

Is Caiso public or private?

The California Independent System Operator (CAISO) is a non-profit Independent System Operator (ISO) serving California.

When do LSES have to show they met their RA obligation?

For the monthly filings LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. Additionally, on a monthly basis from July through December, LSEs must demonstrate they have met their revised (due to load migration) local obligation.

How does the RA Policy Framework help CAISO?

The Commission’s RA policy framework – implemented as the RA program – guides resource procurement and promotes infrastructure investment by requiring that LSEs procure capacity so that capacity is available to the CAISO when and where needed.

Who is white RA in the Starcraft 2 community?

Liquipedia will soon drop support for Internet Explorer. Aleksey ” White-Ra ” Krupnyk is a professional Brood War and StarCraft II player from Ukraine. White-Ra played Protoss in Brood War and continues to play Protoss in StarCraft II. White-Ra played Brood War for several years and is considered a veteran in the Brood War community.

How often does the RA commission evaluate LSE filings?

Commission staff evaluates LSE filings annually and monthly ensure accuracy and completeness. Commission staff also lead annual RA proceedings to refine the RA program, the most recent of which is R.19-11-009.

https://www.youtube.com/channel/UCb5zFPkSjICAppfN46Zt9oQ

The Commission’s RA policy framework – implemented as the RA program – guides resource procurement and promotes infrastructure investment by requiring that LSEs procure capacity so that capacity is available to the CAISO when and where needed.

For the monthly filings LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. Additionally, on a monthly basis from July through December, LSEs must demonstrate they have met their revised (due to load migration) local obligation.

What was the most recent RA commission decision?

Commission staff also lead annual RA proceedings to refine the RA program, the most recent of which is R.19-11-009. This decision addresses issues scoped as Track 3.A, including adopting a local capacity requirement reduction compensation mechanism and the central procurement entity’s competitive neutrality rules.

Commission staff evaluates LSE filings annually and monthly ensure accuracy and completeness. Commission staff also lead annual RA proceedings to refine the RA program, the most recent of which is R.19-11-009.